SH 87 over Refinery Pipelines

0.4 MI SW OF SH 82 · County 245, Texas · Built 1930 · 4 Lanes · 14,496 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
201240030701009
Year Built
1930
Reconstructed
1967
Length
14 m (45.9 ft)
Max Span
7.6 m
Width
16.9 m (55.4 ft)
Lanes
4
Daily Traffic
14,496
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.