PEVITOT RD over DRAIN DITCH
0.7 MI E OF SH 364 · County 245, Texas · Built 1973 · 2 Lanes · 143 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.052492, -94.177186
This bridge is in worse condition than 60.7% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 53 years old.
Nearby Bridges
WASHINGTON BLVD over CALDWOOD CUTOFF
Built 1963
AVALON AVE over DRAIN DITCH
Built 1989
FM 364 over JONES GULLY
Built 1999
FM 364 over DITCH 202 B
Built 2004
LANGHAM RD. over JANES GULLY
Built 2004
WALDEN ROAD EB over DRAINAGE DITCH
Built 1998
WALDEN RD WB over DRAINAGE DITCH
Built 1973
WESCALDER RD over PORT ARTHUR FR WTR CANAL
Built 1989
BAKER RD. over DRAIN DITCH
Built 1970
WASHINGTON BLVD over HILLEBRANDT BAYOU
Built 1963
Bridge Details
- Structure #
- 201240B00903001
- Year Built
- 1973
- Length
- 18.6 m (61 ft)
- Max Span
- 9.4 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 143
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.