AVALON AVE over DRAIN DITCH
0.75 MI S OF US 90 · County 245, Texas · Built 1989 · 2 Lanes · 282 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.055919, -94.187492
This bridge is in worse condition than 30.9% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 37 years old.
Nearby Bridges
FM 364 over JONES GULLY
Built 1999
WESCALDER RD over PORT ARTHUR FR WTR CANAL
Built 1989
WASHINGTON BLVD over CALDWOOD CUTOFF
Built 1963
WASHINGTON BLVD. over DRAIN DITCH
Built 1970
PEVITOT RD over DRAIN DITCH
Built 1973
FM 364 over DITCH 202 B
Built 2004
BAKER RD. over DRAIN DITCH
Built 1970
WASHINGTON BLVD over PT ART FR WTR CANAL
Built 1940
WALDEN RD WB over DRAINAGE DITCH
Built 1973
WALDEN ROAD EB over DRAINAGE DITCH
Built 1998
Bridge Details
- Structure #
- 201240B00048001
- Year Built
- 1989
- Length
- 18.9 m (62 ft)
- Max Span
- 9.4 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 282
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $69,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.