IH 30WB TO IH369SB over IH 30
1.45 MI E OF FM 2878 · County 037, Texas · Built 2010 · 2 Lanes · 2,660 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.45225, -94.096844
This bridge is in worse condition than 71.2% of bridges in County 037. The average bridge in Texas is 0 years old; this one is 16 years old.
Nearby Bridges
IH 369NB TO IH3OWB over IH 30 & PAVILION PKWY
Built 2010
IH369NB TO IH30 EB over IH 30 EBFR
Built 2010
IH 30 EB FTG ROAD over DRAW
Built 2010
PAVILION PARKWAY over IH 30
Built 2011
IH 30EB TO IH369SB over IH30 EBFR & PAVILION PWY
Built 2010
IH 369 SB FR D/C over IH 369 SB EXIT RAMP
Built 2011
IH 369 SB over US 82
Built 1981
IH 369 NB over US 82
Built 1981
IH30WU-TURN@FM559 over IH 30
Built 2010
FM 559 over IH 30
Built 2010
Bridge Details
- Structure #
- 190190061007203
- Year Built
- 2010
- Length
- 397.2 m (1303.1 ft)
- Max Span
- 63.7 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 2,660
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.