IH369NB TO IH30 EB over IH 30 EBFR
0.55 MI N OF US 82 · County 037, Texas · Built 2010 · 2 Lanes · 19,140 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.450817, -94.096817
This bridge is in worse condition than 71.2% of bridges in County 037. The average bridge in Texas is 0 years old; this one is 16 years old.
Nearby Bridges
IH 30WB TO IH369SB over IH 30
Built 2010
IH 369NB TO IH3OWB over IH 30 & PAVILION PKWY
Built 2010
IH 30 EB FTG ROAD over DRAW
Built 2010
PAVILION PARKWAY over IH 30
Built 2011
IH 369 SB FR D/C over IH 369 SB EXIT RAMP
Built 2011
IH 30EB TO IH369SB over IH30 EBFR & PAVILION PWY
Built 2010
IH 369 SB over US 82
Built 1981
IH 369 NB over US 82
Built 1981
IH 30 FR E U-TURN over IH 30
Built 2009
IH30WU-TURN@FM559 over IH 30
Built 2010
Bridge Details
- Structure #
- 190190061007141
- Year Built
- 2010
- Length
- 427 m (1400.9 ft)
- Max Span
- 32 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 19,140
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.