IH 45 SB ML over RICHLAND CREEK RELIEF

0.60 MI N OF SH 14 · County 349, Texas · Built 2005 · 3 Lanes · 20,129 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
181750009301087
Year Built
2005
Reconstructed
2018
Length
317 m (1040 ft)
Max Span
24.4 m
Width
16.4 m (53.8 ft)
Lanes
3
Daily Traffic
20,129
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.