IH45 NB ML over RICHLAND CREEK

1.30 MI N OF SH 14 · County 349, Texas · Built 1990 · 3 Lanes · 20,129 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
181750009301081
Year Built
1990
Reconstructed
2018
Length
219.5 m (720.1 ft)
Max Span
24.4 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
20,129
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.