US 80 WBML over E FORK TRINITY RELIEF #1

0.7 MI E OF DALLAS CO · County 257, Texas · Built 2024 · 2 Lanes · 87,026 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
181300009503420
Year Built
2024
Length
91.4 m (299.9 ft)
Max Span
33.5 m
Width
15.4 m (50.5 ft)
Lanes
2
Daily Traffic
87,026
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.