US 80 SFR over BUFFALO CREEK RELIEF

0.45 MI SE OF FM 460 · County 257, Texas · Built 1930 · 2 Lanes · 12,005 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
181300009503013
Year Built
1930
Length
88.7 m (291 ft)
Max Span
8.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
12,005
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,000
Total Project Cost
$18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.