SH 121 over MIDWAY BRANCH

3.35 MI NE OF IH 35E · County 121, Texas · Built 1998 · 12 Lanes · 15,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180610354701010
Year Built
1998
Length
15.9 m (52.2 ft)
Max Span
2.4 m
Lanes
12
Daily Traffic
15,000
Material
Concrete
Design
Culvert
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.