FM 544 over DRAINAGE DITCH
0.3 MI E OF SH 121 · County 121, Texas · Built 2019 · 6 Lanes · 12,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.046617, -96.922633
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
FM 544 WB over SH 121 TOLL
Built 2006
FM 544 EB over SH 121 TOLL
Built 2006
SH 121 over MIDWAY BRANCH
Built 1998
SH 121 BUS NB CONN over SH 121 TOLL
Built 1999
FM 2281 SB over SRT
Built 1999
FM 2281 over DRAIN
Built 1999
FM 2281 NB over SRT
Built 1999
SH 121 over DRAIN
Built 1994
CARROLLTON PKWY WB over SRT 121
Built 2006
CARROLLTON PKWY EB over SRT 121
Built 2006
Bridge Details
- Structure #
- 180610061905284
- Year Built
- 2019
- Length
- 8.8 m (28.9 ft)
- Max Span
- 2.4 m
- Width
- 36.8 m (120.7 ft)
- Lanes
- 6
- Daily Traffic
- 12,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.