FM 720 over PEACH CREEK

0.33 MI E OF HART RD · County 121, Texas · Built 2014 · 6 Lanes · 35,043 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180610156701019
Year Built
2014
Length
36.6 m (120.1 ft)
Max Span
36.6 m
Width
34.1 m (111.9 ft)
Lanes
6
Daily Traffic
35,043
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.