FM 720 over Harts Branch
1.15 MI W OF FM 423 · County 121, Texas · Built 2014 · 6 Lanes · 39,197 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.168581, -96.909194
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 12 years old.
Nearby Bridges
Pecan Dr over Harts Branch
Built 1999
FM 720 over PEACH CREEK
Built 2014
Woodlake Pkwy over Harts Branch
Built 1999
WITT RD over COTTONWOOD BRANCH
Built 2012
FM 423 SB over COTTONWOOD BRANCH
Built 2011
Walker Lane over Harts Branch
Built 2005
FM 423 NB over COTTONWOOD BRANCH
Built 2012
FM 423 over SOUTH COTTONWOOD BRANCH
Built 2005
Anthem Dr over Drain
Built 2017
Wickford Trail over Drain
Built 2019
Bridge Details
- Structure #
- 180610156701018
- Year Built
- 2014
- Length
- 67.7 m (222.1 ft)
- Max Span
- 22.6 m
- Width
- 34.1 m (111.9 ft)
- Lanes
- 6
- Daily Traffic
- 39,197
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.