DC IH35SB SH121WB over SH 121 WBFR/IH 35E SBFR

IH35 / SH121 INTERCHANGE · County 121, Texas · Built 2019 · 1 Lanes · 3,700 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180610019602511
Year Built
2019
Length
729.7 m (2394 ft)
Max Span
38.4 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
3,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.