DC SH121EB IH35NB over SH 121 / IH 35E

IH 35/SH 121 Interchange · County 121, Texas · Built 2019 · 1 Lanes · 3,700 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180610019602509
Year Built
2019
Length
1138.7 m (3735.9 ft)
Max Span
42.1 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
3,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.