IH 35 SBML over CLEAR CREEK RELIEF

2.40 MI S OF FM 455 · County 121, Texas · Built 1956 · 3 Lanes · 36,220 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
180610019502056
Year Built
1956
Reconstructed
1989
Length
64.6 m (211.9 ft)
Max Span
9.1 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
36,220
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.