IH 35 SBML over CLEAR CREEK

2.05 MI S OF FM 455 · County 121, Texas · Built 1958 · 2 Lanes · 36,220 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
180610019502054
Year Built
1958
Reconstructed
1989
Length
299.9 m (983.9 ft)
Max Span
22.9 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
36,220
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000
Total Project Cost
$94,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.