IH35W over DRAW

0.60 MI N OF TARRANT CL · County 121, Texas · Built 1991 · 11 Lanes · 68,914 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180610008113170
Year Built
1991
Length
12.8 m (42 ft)
Max Span
2.4 m
Lanes
11
Daily Traffic
68,914
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.