LUNA RD NB over COOKS BRANCH
0.45 MI N OF VALLEY VIEW · County 113, Texas · Built 1982 · 3 Lanes · 10,676 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.923856, -96.925211
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 44 years old.
Nearby Bridges
LUNA ROAD SB over COOKS BRANCH
Built 1982
PGBT NB over Cooks Branch
Built 2006
PGBT SB over Cooks Branch
Built 2006
SH 190 NB On-Ramp over R.O.W.
Built 2006
PGBT SB Off-Ramp over Drain
Built 2006
PGBT SB On-Ramp over Drain
Built 2006
PGBT NB Off-Ramp over Drain
Built 2006
VALLEY VIEW LANE over DRAINAGE CHANNEL
Built 1976
HUTTON DRIVE over COOKS BRANCH
Built 1982
PGBT SB over IH 635&ELM FK TRINITY RI
Built 2005
Bridge Details
- Structure #
- 180570H01757004
- Year Built
- 1982
- Length
- 153.6 m (503.9 ft)
- Max Span
- 25.3 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 3
- Daily Traffic
- 10,676
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $39,000
- Total Project Cost
- $49,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.