VALLEY VIEW LANE over DRAINAGE CHANNEL

0.6 MI NE OF IH 635 · County 113, Texas · Built 1976 · 5 Lanes · 18,238 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570G01155006
Year Built
1976
Reconstructed
1984
Length
12.5 m (41 ft)
Max Span
2.4 m
Lanes
5
Daily Traffic
18,238
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.