IH 635 RAMP W-LM over IH 635

2.5 MI W OF IH 35E · County 113, Texas · Built 2001 · 2 Lanes · 13,311 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570237407452
Year Built
2001
Length
790 m (2591.9 ft)
Max Span
50.9 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
13,311
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.