CABELL RD over HACKBERRY CREEK

0.1 MI NW OF BELT LINE RD · County 113, Texas · Built 2018 · 4 Lanes · 500 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570D01130003
Year Built
2018
Length
32.3 m (106 ft)
Max Span
6.1 m
Width
18.7 m (61.4 ft)
Lanes
4
Daily Traffic
500
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.