Fountain Dr. over Hackberry Creek

0.2 MI W of Royal Ln · County 113, Texas · Built 2014 · 2 Lanes · 231 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180570D08712003
Year Built
2014
Length
86.9 m (285.1 ft)
Max Span
30.5 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
231
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.