SCYENE RD over DRAINAGE DITCH

0.4 MI E OF BERRY DR · County 113, Texas · Built 1980 · 2 Lanes · 4,007 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570C02690002
Year Built
1980
Length
12.8 m (42 ft)
Max Span
2.1 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
4,007
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.