BERRY RD over N MESQUITE CREEK TRIB
0.60 MI N OF LAWSON RD · County 113, Texas · Built 1945 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Culvert
0
Failed
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 0 | Failed |
Location
32.738853, -96.535906
This bridge is in worse condition than 100% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 81 years old.
Nearby Bridges
CLAY-MATHIS RD over S MESQUITE CREEK TRIB
Built 1950
LAWSON RD over N MESQUITE CREEK TRIB
Built 2013
FAITHON LUCAS BLVD over N MESQUITE CREEK TRIB
Built 1987
EDWARDS CHURCH RD over NORTH MESQUITE CREEK
Built 2007
LAWSON RD over NORTH MESQUITE CREEK
Built 1997
FAITHON LUCAS SB over NORTH MESQUITE CREEK
Built 1987
FAITH0N LUCAS NB over NORTH MESQUITE CREEK
Built 1987
LAWSON RD over LONG CREEK
Built 1976
SCYENE RD over DRAINAGE DITCH
Built 1980
MESQUITE VALLEY RD over NORTH MESQUITE CREEK
Built 1993
Bridge Details
- Structure #
- 180570C00235001
- Year Built
- 1945
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $13,000
- Total Project Cost
- $15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.