MCCALLUM BLVD over MCKAMY BRANCH
0.4 MI E OF PRESTON RD · County 113, Texas · Built 1974 · 4 Lanes · 4,434 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.985158, -96.797267
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 52 years old.
Nearby Bridges
CAMPBELL RD over MCKAMY BRANCH
Built 1976
DAVENPORT RD over MCKAMY BRANCH
Built 1989
MCCALLUM BLVD EB over EAST FORK MCKAMY BRANCH
Built 1977
DAVENPORT RD over MCKAMY BRANCH
Built 1995
MCCALLUM BLVD WB over EAST FORK MCKAMY BRANCH
Built 1989
HILLCREST AVE over EAST FORK MCKAMY BRANCH
Built 1989
FRANKFORD RD over MCKAMY BRANCH TRIBUTARY
Built 1986
WESTGROVE DRIVE over WHITE ROCK CREEK
Built 1974
MEADOWCREEK DR over KIOWA BRANCH
Built 1975
FRANKFORD RD WB over MCKAMY BRANCH
Built 1986
Bridge Details
- Structure #
- 1805709M2980003
- Year Built
- 1974
- Length
- 36.6 m (120.1 ft)
- Max Span
- 12.2 m
- Width
- 17 m (55.8 ft)
- Lanes
- 4
- Daily Traffic
- 4,434
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $13,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.