HILLCREST AVE over EAST FORK MCKAMY BRANCH

0.10 MI N OF MCCALLUM BLV · County 085, Texas · Built 1989 · 4 Lanes · 16,047 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
1804309H6090004
Year Built
1989
Length
42.7 m (140.1 ft)
Max Span
18.3 m
Width
21.3 m (69.9 ft)
Lanes
4
Daily Traffic
16,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$12,000
Total Project Cost
$15,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.