PGBT NB On-Ramp over Tributary of Elm Fork

3.3 Mi N of IH 635 · County 113, Texas · Built 2006 · 1 Lanes · 10,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570296402591
Year Built
2006
Length
236.5 m (775.9 ft)
Max Span
24.4 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
10,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.