BELT LINE RD WB over HUTTON BRANCH
0.4 MI W OF IH 35E · County 113, Texas · Built 1990 · 3 Lanes · 11,994 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.952372, -96.917289
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
BELT LINE RD EB over HUTTON BRANCH
Built 1990
IH 35E SBFR over Hutton Branch
Built 2015
IH 35E SB FR over College Ave and RR
Built 2018
BELT LINE RD over DRAINAGE DITCH
Built 1990
IH 35E over W BELT LINE BNSF RR etc
Built 2018
IH 35E NBFR over Hutton Branch
Built 1957
IH 35E NB FR over College Ave and DART RR
Built 2018
IH 35E SB FR over 4th Ave Main St RR
Built 2018
Belt Line Road over BNSF RR
Built 2018
IH 35E NB FR over 4th Ave Main St RR
Built 2018
Bridge Details
- Structure #
- 180570H00225069
- Year Built
- 1990
- Length
- 73.2 m (240.2 ft)
- Max Span
- 24.4 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 3
- Daily Traffic
- 11,994
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,000
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.