N GALLOWAY AVE over IH 635
0.6 MI N OF IH 30 · County 113, Texas · Built 1968 · 5 Lanes · 9,830 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.831644, -96.631503
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 58 years old.
Nearby Bridges
OATES DR over IH 635
Built 1968
OATES DR over IH 635
Built 2023
I30 WB/I635 NB DC over IH30 WBFR & IH635 NBFR
Built 2024
North Galloway Ave over IH-30
Built 2021
IH30WB to IH635SB over IH 635 & IH 30
Built 2023
IH 30 WBML over IH 635
Built 1971
IH 30 EB to 635 NB over IH 30
Built 1971
IH 635 NB to 30 WB over IH 30 to IH 635 Ramps
Built 2022
OATES DRIVE EB over LONG BRANCH CREEK
Built 1986
OATES DRIVE WB over LONG BRANCH CREEK
Built 1986
Bridge Details
- Structure #
- 180570237402073
- Year Built
- 1968
- Length
- 138.7 m (455.1 ft)
- Max Span
- 43.3 m
- Width
- 20.2 m (66.3 ft)
- Lanes
- 5
- Daily Traffic
- 9,830
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $54,000
- Total Project Cost
- $68,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.