IH30WB to IH635SB over IH 635 & IH 30
IH30 & IH 635 InterChange · County 113, Texas · Built 2023 · 2 Lanes · 29,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
9
Excellent
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 9 | Excellent |
| Substructure | 8 | Very Good |
Location
32.823267, -96.629558
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 3 years old.
Nearby Bridges
IH 30 WBML over IH 635
Built 1971
IH 30 EB to 635 NB over IH 30
Built 1971
IH 635 NB to 30 WB over IH 30 to IH 635 Ramps
Built 2022
I30 WB/I635 NB DC over IH30 WBFR & IH635 NBFR
Built 2024
North Galloway Ave over IH-30
Built 2021
I635 NB/I30 EB DC over I-30 EBFR
Built 2024
IH 30 WBFR over Drainage Ditch
Built 1971
IH 30 ML & FRs over Mesquite Creek
Built 2022
DRIFTWOOD DR over SOUTH MESQUITE CREEK
Built 1984
N GALLOWAY AVE over IH 635
Built 1968
Bridge Details
- Structure #
- 180570000911518
- Year Built
- 2023
- Length
- 877.2 m (2878 ft)
- Max Span
- 75.6 m
- Width
- 11.6 m (38.1 ft)
- Lanes
- 2
- Daily Traffic
- 29,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.