IH 30 Managed Ln over IH 30

0.16 Mi E of Cockrell Hil · County 113, Texas · Built 2016 · 1 Lanes · 195,488 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180570106804574
Year Built
2016
Length
380.1 m (1247 ft)
Max Span
41.1 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
195,488
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.