COCKRELL HILL RD over IH 30
1.2 MI E OF LOOP 12 · County 113, Texas · Built 2000 · 7 Lanes · 30,201 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.766186, -96.895619
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 26 years old.
Nearby Bridges
IH 30 Managed Ln over IH 30
Built 2016
N. Cockrell Hill R over Drainage Ditch
Built 2005
IH 30 over DRAINAGE DITCH
Built 2000
IH 30 Managed Ln over IH 30
Built 2016
La Reunion Parkway over Drainage Ditch
Built 2005
IH 30 EB over CHALK HILL RD
Built 2006
IH 30 WB over CHALK HILL RD
Built 2006
La Reunion Parkway over Drainage Ditch
Built 1995
LOOP 12 CONNECTOR over IH 30
Built 2005
SINGLETON BLVD over DRAINAGE CHANNEL
Built 1986
Bridge Details
- Structure #
- 180570106804203
- Year Built
- 2000
- Length
- 106.7 m (350.1 ft)
- Max Span
- 37.2 m
- Width
- 29.4 m (96.5 ft)
- Lanes
- 7
- Daily Traffic
- 30,201
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $56,000
- Total Project Cost
- $70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.