RED BIRD LN over US 67

1.55 MI NE OF IH 20 · County 113, Texas · Built 1973 · 7 Lanes · 9,488 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570026103047
Year Built
1973
Length
85.3 m (279.9 ft)
Max Span
25.9 m
Width
28.6 m (93.8 ft)
Lanes
7
Daily Traffic
9,488
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$37,000
Total Project Cost
$46,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.