US 67 SBML over HAMPTON RD

2.05 MI NE OF IH 20 · County 113, Texas · Built 1969 · 3 Lanes · 44,989 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570026103021
Year Built
1969
Reconstructed
2022
Length
103 m (337.9 ft)
Max Span
28.3 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
44,989
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,000
Total Project Cost
$33,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.