US 80 EB FR over NORTH MESQUITE CREEK

2.00 MI E OF IH 635 · County 113, Texas · Built 2006 · 2 Lanes · 15,891 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570009502213
Year Built
2006
Length
57.9 m (190 ft)
Max Span
21.3 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
15,891
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.