LP 12 SBFR over SH 183 & TXEpress Lanes

@ LP12 & SH183 · County 113, Texas · Built 2023 · 3 Lanes · 30,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
180570009403366
Year Built
2023
Length
388.6 m (1274.9 ft)
Max Span
38.1 m
Width
14.9 m (48.9 ft)
Lanes
3
Daily Traffic
30,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.