SH 183 EB over Loop 12

0.65 Mi West of IH35 · County 113, Texas · Built 2017 · 5 Lanes · 217,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570009403344
Year Built
2017
Reconstructed
2024
Length
71.6 m (234.9 ft)
Max Span
40.8 m
Width
26.5 m (86.9 ft)
Lanes
5
Daily Traffic
217,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.