SOUTHWESTERN BD EB over US 75

6.15 MI N OF IH 30 · County 113, Texas · Built 1999 · 3 Lanes · 3,315 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570004707358
Year Built
1999
Length
60.4 m (198.2 ft)
Max Span
30.5 m
Width
18.3 m (60 ft)
Lanes
3
Daily Traffic
3,315
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$19,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.