COLLINS BLVD over US 75 & DART RAIL
4.45 MI NE OF IH 635 · County 113, Texas · Built 1985 · 4 Lanes · 13,246 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.967675, -96.721197
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 41 years old.
Nearby Bridges
Greenville Ave SB over DART Pedestrian Walkway
Built 2000
Greenville Ave NB over DART Pedestrian Walkway
Built 2000
Greenville Avenue over Duck Creek
Built 1979
Jay Ell Drive over Duck Creek
Built 1979
CAMPBELL RD over DRAW
Built 1980
US 75 SB over CAMPBELL RD
Built 1990
US 75 SB over ARAPAHO RD
Built 1990
US 75 NB over ARAPAHO RD
Built 1990
US 75 NB over CAMPBELL RD
Built 1990
Firman Drive over Duck Creek
Built 1979
Bridge Details
- Structure #
- 180570004707289
- Year Built
- 1985
- Length
- 172.2 m (565 ft)
- Max Span
- 35.1 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 13,246
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $57,000
- Total Project Cost
- $71,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.