US 75 NB over ARAPAHO RD
3.80 MI NE OF IH 635 · County 113, Texas · Built 1990 · 6 Lanes · 116,919 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
32.960714, -96.727564
This bridge is in worse condition than 91.2% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 36 years old.
Nearby Bridges
US 75 SB over ARAPAHO RD
Built 1990
Greenville Ave NB over DART Pedestrian Walkway
Built 2000
Greenville Ave SB over DART Pedestrian Walkway
Built 2000
COLLINS BLVD over US 75 & DART RAIL
Built 1985
Lindale Lane over Cottonwood Branch Trib
Built 1960
US 75 NB over BELT LINE RD
Built 1988
US 75 SB over BELT LINE RD
Built 1988
Floyd Road over Cottonwood Branch
Built 1961
Kaufman Street over Floyd Branch
Built 1975
Provincetown Lane over Nantucket Branch
Built 1986
Bridge Details
- Structure #
- 180570004707287
- Year Built
- 1990
- Length
- 118 m (387.1 ft)
- Max Span
- 42.4 m
- Width
- 25.9 m (85 ft)
- Lanes
- 6
- Daily Traffic
- 116,919
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.