Motley Dr. SB over IH 30
1.8 Mi. SW of IH 635 · County 113, Texas · Built 1972 · 2 Lanes · 15,468 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.809931, -96.654842
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 54 years old.
Nearby Bridges
Motley Dr. NB over IH 30
Built 1960
TOWN EAST & PALM over SOUTH MESQUITE CRK TRIB
Built 1965
EMERALD DR over SOUTH MESQUITE CRK TRIB
Built 1975
BAHAMAS DR over TRIB S MESQUITE CRK
Built 1970
FLAMINGO WAY over SOUTH MESQUITE CRK TRIB
Built 1965
Big Town Blvd NB over IH 30
Built 1960
Big Town Blvd. SB over IH 30
Built 1960
TOWN EAST BLVD over SOUTH MESQUITE CRK TRIB
Built 1950
MOON DRIVE over SOUTH MESQUITE CREEK
Built 2000
BAKER DR over SOUTH MESQUITE CRK TRIB
Built 1966
Bridge Details
- Structure #
- 180570000911374
- Year Built
- 1972
- Length
- 91.4 m (299.9 ft)
- Max Span
- 19.8 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 15,468
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,000
- Total Project Cost
- $18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.