TOWN EAST BLVD over SOUTH MESQUITE CRK TRIB
0.2 MI NE OF RUSTOWN DR · County 113, Texas · Built 1950 · 6 Lanes · 12,450 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.806917, -96.639925
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 76 years old.
Nearby Bridges
EMERALD DR over SOUTH MESQUITE CRK TRIB
Built 1975
GUS THOMASSON RD over SOUTH MESQUITE CRK TRIB
Built 1987
North Mesquite Dr. over South Mesquite Creek
Built 2020
TOWN EAST & PALM over SOUTH MESQUITE CRK TRIB
Built 1965
Town East Blvd EB over SOUTH MESQUITE CREEK
Built 1969
Town East Blvd WB over SOUTH MESQUITE CREEK
Built 1969
BAKER DR over SOUTH MESQUITE CRK TRIB
Built 1966
TOWN CENTER DR over SOUTH MESQUITE CREEK
Built 1991
IH 635 SB over TOWN EAST BLVD
Built 2009
DRIFTWOOD DR over SOUTH MESQUITE CREEK
Built 1984
Bridge Details
- Structure #
- 180570C02950007
- Year Built
- 1950
- Length
- 15.9 m (52.2 ft)
- Max Span
- 3 m
- Width
- 29.2 m (95.8 ft)
- Lanes
- 6
- Daily Traffic
- 12,450
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.