LOOP 12 over IH 30

AT LOOP 12 INTERCHANGE · County 113, Texas · Built 1977 · 6 Lanes · 22,343 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
180570000911345
Year Built
1977
Length
380.4 m (1248 ft)
Max Span
44.2 m
Width
32.3 m (106 ft)
Lanes
6
Daily Traffic
22,343
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$225,000
Total Project Cost
$281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.