LOOP 12 NBFR over IH 30
AT LOOP 12 INTERCHANGE · County 113, Texas · Built 1979 · 3 Lanes · 9,099 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.798233, -96.682439
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 47 years old.
Nearby Bridges
LOOP 12 SBFR over IH 30
Built 1979
LOOP 12 over IH 30
Built 1977
US 80 RAMP E over RAMP D-1 & F
Built 1979
US WB Conn. B-1 over IH 30
Built 1979
US 80 EB over IH 30 EB On-Ramp
Built 1979
US 80 WB over IH 30
Built 1979
US 80 WB Ramp C-1 over IH 30
Built 1979
IH 30 over Drainage Ditch
Built 1979
IH 30 WBFR over Drainage Ditch
Built 1979
SAMUELL BLVD over PRAIRIE CREEK
Built 1991
Bridge Details
- Structure #
- 180570000911338
- Year Built
- 1979
- Length
- 103.6 m (339.9 ft)
- Max Span
- 46.3 m
- Width
- 18.9 m (62 ft)
- Lanes
- 3
- Daily Traffic
- 9,099
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.