IH 30 EB On-Rp A over IH 30 EB Off-Rp B

0.9 Mi W of LP 12 · County 113, Texas · Built 1979 · 1 Lanes · 15,110 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
180570000911335
Year Built
1979
Length
104.5 m (342.8 ft)
Max Span
36 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
15,110
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.