Cesar Chavez NB over IH 30
0.3 Mi W of IH 45 · County 113, Texas · Built 1964 · 2 Lanes · 1,910 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.775056, -96.785269
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 62 years old.
Nearby Bridges
IH 30 EB Conn B over IH 30 EB
Built 1966
IH 30 WB Conn D over IH 30 EB
Built 1966
IH 30 WB Conn C over IH 30 EB
Built 1966
IH 30 WB Conn A over IH 30 WB
Built 1966
Cesar Chavez SB over IH 30
Built 1964
IH 30 EB Conn E over IH 30 WB
Built 1966
IH 30 EB Conn F over IH 30 WB
Built 1966
IH 30 WB Conn D over IH 30 WB
Built 1966
IH 30 EB Conn E over IH 30 EB
Built 1966
Harwood St over IH 30 EB
Built 1965
Bridge Details
- Structure #
- 180570000911263
- Year Built
- 1964
- Length
- 179.2 m (587.9 ft)
- Max Span
- 22.3 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,910
- Material
- Concrete Continuous
- Design
- Other
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $33,000
- Total Project Cost
- $41,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.