Cesar Chavez SB over IH 30

0.4 Mi W of IH 45 · County 113, Texas · Built 1964 · 2 Lanes · 16,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180570000911262
Year Built
1964
Length
189.3 m (621.1 ft)
Max Span
22.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
16,400
Material
Concrete Continuous
Design
Other
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$35,000
Total Project Cost
$44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.