SH 78 over Drain

1.3 Mi NE of IH 30 · County 113, Texas · Built 1967 · 8 Lanes · 19,930 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180570000902302
Year Built
1967
Length
7.3 m (24 ft)
Max Span
3 m
Lanes
8
Daily Traffic
19,930
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.