SH 78 EB (Garland) over White Rock Creek Relief

1.85 Mi NE of IH 30 · County 113, Texas · Built 1923 · 3 Lanes · 16,010 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570000902002
Year Built
1923
Reconstructed
1933
Length
41.1 m (134.8 ft)
Max Span
7 m
Width
17.8 m (58.4 ft)
Lanes
3
Daily Traffic
16,010
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$14,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.